Key Insights
The Latin American data center construction market is experiencing robust growth, projected to reach \$5.14 billion in 2025 and maintain a Compound Annual Growth Rate (CAGR) exceeding 8.71% from 2025 to 2033. This expansion is fueled by several key drivers. The increasing adoption of cloud computing and digital transformation initiatives across various sectors, including Banking, Financial Services, and Insurance (BFSI), IT and Telecommunications, and Government and Defense, is creating a surge in demand for data center infrastructure. Furthermore, Latin America's burgeoning e-commerce sector and the rise of big data analytics are significantly contributing to this market growth. The market is segmented by infrastructure type (electrical and mechanical), tier level (Tier I-IV), enterprise size (small, medium, and large), and end-user industry. Brazil, Mexico, and Argentina represent the largest markets within the region, but growth is also anticipated across other Latin American countries as digital infrastructure development accelerates. While challenges such as regulatory hurdles and infrastructure limitations exist, the overall market outlook remains positive, driven by sustained investment in digital infrastructure and expanding technological adoption.
The market's segmentation offers opportunities for specialized players. Large-scale enterprises dominate the market currently, but the growth of SMEs presents a lucrative segment for smaller construction firms and data center providers. The increasing demand for high-availability and resilient data centers is driving the growth of Tier III and Tier IV facilities. The significant investments by major players like Ascenty, Equinix, and CyrusOne in the region demonstrate the confidence in the long-term growth potential. This competitive landscape further accelerates innovation and drives down costs, making data center construction more accessible across Latin America. The ongoing expansion of fiber optic networks and improved energy infrastructure are further bolstering the market's positive trajectory, supporting the continued growth forecast.
This dynamic report provides a comprehensive analysis of the Latin America data center construction market, offering invaluable insights for investors, industry professionals, and strategic decision-makers. The market is experiencing robust growth driven by increasing digitalization, cloud adoption, and government initiatives. This report covers the period 2019-2033, with a focus on the 2025-2033 forecast period. Expect detailed analysis of market size, segmentation, key players, and future trends, all backed by robust data and expert insights.

Latin America Data Center Construction Market Market Structure & Competitive Landscape
The Latin American data center construction market exhibits a moderately concentrated structure. While a few large players dominate certain segments (e.g., Ascenty Data Centers, Equinix), a significant number of smaller, regional firms contribute to the overall market activity. The market concentration ratio (CR4) for 2024 is estimated at xx%, indicating a balance between established players and emerging competitors.
Innovation Drivers: Technological advancements like AI, IoT, and 5G are significantly driving demand for advanced data center infrastructure. The adoption of sustainable and energy-efficient technologies is also gaining traction.
Regulatory Impacts: Government regulations concerning data privacy, security, and infrastructure development influence market dynamics. Incentives and policies promoting digital transformation are boosting investment in data centers across the region.
Product Substitutes: The primary substitute for traditional data center construction is cloud-based infrastructure. However, concerns regarding data sovereignty and latency are limiting the complete shift to cloud.
End-User Segmentation: The market is driven by a diverse end-user base including Banking, Financial Services, and Insurance (BFSI), IT and Telecommunications, Government and Defense, Healthcare, and other sectors. BFSI and IT & Telecommunications represent the largest segments, accounting for approximately xx% of the total market in 2024.
M&A Trends: The market witnessed xx M&A transactions in the period 2019-2024. A notable example is the proposed acquisition of Odata by Aligned in late 2022, valued at approximately $1.8 Billion. This signifies consolidation within the sector and the growing interest from global players.
Latin America Data Center Construction Market Market Trends & Opportunities
The Latin American data center construction market is projected to witness significant growth, with a Compound Annual Growth Rate (CAGR) of xx% during the forecast period (2025-2033). This growth is fueled by the rising demand for digital services, expanding cloud computing adoption, and the increasing need for robust and reliable data infrastructure across the region. Market penetration rates for Tier III and IV data centers are expected to increase from xx% in 2024 to xx% by 2033. Key opportunities lie in the expansion of cloud services, the growth of digital economies in countries like Brazil and Mexico, and the increasing adoption of hyperscale data center models. The market is also witnessing a shift towards sustainable and green data center technologies, presenting opportunities for companies that can offer such solutions. Competitive dynamics are characterized by intense competition among established players and new entrants, leading to innovative offerings and pricing strategies.

Dominant Markets & Segments in Latin America Data Center Construction Market
Brazil and Mexico are the dominant markets within Latin America, accounting for approximately xx% of the total market value in 2024. Argentina and the Rest of Latin America also contribute significantly, but at a slower growth rate compared to Brazil and Mexico.
Key Growth Drivers:
- Robust Economic Growth: Strong economic performance in leading Latin American economies fuels investment in data center infrastructure.
- Government Initiatives: Government policies and incentives supporting digital transformation create a favorable environment for data center development.
- Increased Cloud Adoption: The widespread adoption of cloud computing necessitates substantial increases in data center capacity.
- Growing Digital Economy: The expanding digital economy across Latin America necessitates improved digital infrastructure.
Dominant Segments:
- Infrastructure Type: Mechanical infrastructure currently holds the largest market share, driven by the high demand for HVAC and power systems in large-scale data centers. General construction is also a significant segment.
- Tier Type: Tier III data centers are the most prevalent, followed by Tier II.
- Size of Enterprise: Large-scale enterprises constitute the largest segment, owing to their high data storage and processing requirements.
- End User: The BFSI sector and IT and Telecommunications industries account for the highest portion of market demand.
Latin America Data Center Construction Market Product Analysis
The market is witnessing a surge in demand for advanced data center products, encompassing modular data centers, prefabricated solutions, and improved power and cooling technologies. These products address the need for faster deployment times, improved scalability, and enhanced energy efficiency. The focus is on solutions that provide higher resilience, security and lower total cost of ownership (TCO).
Key Drivers, Barriers & Challenges in Latin America Data Center Construction Market
Key Drivers:
- Technological advancements: Increased adoption of cloud computing, AI, IoT, and 5G drives demand for advanced data center infrastructure.
- Economic growth: Expanding economies in several Latin American countries fuel investment in data centers.
- Government support: Supportive government policies and regulatory frameworks create a favorable environment for data center development.
Challenges:
- Regulatory hurdles: Complex regulatory environments and bureaucratic processes can hinder project development and timelines.
- Supply chain disruptions: Global supply chain issues and material shortages cause delays and increase costs.
- Competitive intensity: The competitive landscape includes both large international companies and smaller local players, leading to price pressures.
- Energy costs: High energy costs and infrastructure limitations can significantly impact the profitability of data centers.
Growth Drivers in the Latin America Data Center Construction Market Market
The Latin American data center construction market growth is primarily driven by surging demand for digital services, escalating cloud adoption, and the need for robust, reliable data infrastructure. Government support for digital transformation and substantial private sector investments further amplify market expansion.
Challenges Impacting Latin America Data Center Construction Market Growth
Challenges include navigating complex regulatory landscapes, mitigating supply chain disruptions, and managing intense competition among diverse players. High energy costs, infrastructure limitations, and skill gaps in the workforce pose additional hurdles.
Key Players Shaping the Latin America Data Center Construction Market Market
- Ascenty Data Centers E Telecomunicacoes
- Constructora Sudamericana S A
- Fortis Construction
- Equinix Inc
- Aceco TI
- Delta Group
- Turner Construction Co
- ZFB Group
- DPR Construction Inc
- HostDime Brasil
- AECOM Limited
- Legrand
- CyrusOne Inc
- RITTAL Sistemas Eletromecânicos Ltda (Rittal GmbH & Co KG)
Significant Latin America Data Center Construction Market Industry Milestones
- January 2023: The Santos Port Authority (SPA) in Brazil contracts Zeittec for a new data center, emphasizing enhanced security features and advanced cabling.
- December 2022: Aligned's intended acquisition of Odata, valued at ~$1.8 Billion, signals market consolidation and expansion into Mexico and Peru.
Future Outlook for Latin America Data Center Construction Market Market
The Latin American data center construction market is poised for sustained growth. Continued investment in digital infrastructure, coupled with supportive government policies and the expanding cloud computing sector, will drive significant market expansion. Strategic partnerships and technological innovations will play a critical role in shaping the future of this dynamic market.
Latin America Data Center Construction Market Segmentation
-
1. Infrastructure Type
-
1.1. Electrical Infrastructure
- 1.1.1. UPS Systems
- 1.1.2. Others Electrical Infrastructure
-
1.2. Mechanical Infrastructure
- 1.2.1. Cooling Systems
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
- 1.3. General Construction
-
1.1. Electrical Infrastructure
-
2. Tier Type
- 2.1. Tier-I and II
- 2.2. Tier-III
- 2.3. Tier-IV
-
3. Size of Enterprise
- 3.1. Small and Medium-scale Enterprise
- 3.2. Large-Scale Enterprise
-
4. End User
- 4.1. Banking, Financial Services, and Insurance
- 4.2. IT and Telecommunications
- 4.3. Government and Defense
- 4.4. Healthcare
- 4.5. Other End Users
Latin America Data Center Construction Market Segmentation By Geography
-
1. Latin America
- 1.1. Brazil
- 1.2. Argentina
- 1.3. Chile
- 1.4. Colombia
- 1.5. Mexico
- 1.6. Peru
- 1.7. Venezuela
- 1.8. Ecuador
- 1.9. Bolivia
- 1.10. Paraguay

Latin America Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of > 8.71% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. Growth in Network Connectivity and Increased Adoption of Digital Transformation Related Technologies in the Region; Favorable tax Incentive Structure Introduced by Local Governments has Led to the Higher Participation from International Players; Ongoing Consolidation Efforts by Major Data Center Construction Companies to Aid their Expansion Activities; Growing Awareness on Modular Deployments and Increasing Rack Density
- 3.3. Market Restrains
- 3.3.1. Integration issues with traditional systems; Data quality and accuracy issues
- 3.4. Market Trends
- 3.4.1. IT and Telecommunications Segment to Hold a Significant Share of the Market
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure Type
- 5.1.1. Electrical Infrastructure
- 5.1.1.1. UPS Systems
- 5.1.1.2. Others Electrical Infrastructure
- 5.1.2. Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.3. General Construction
- 5.1.1. Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Tier Type
- 5.2.1. Tier-I and II
- 5.2.2. Tier-III
- 5.2.3. Tier-IV
- 5.3. Market Analysis, Insights and Forecast - by Size of Enterprise
- 5.3.1. Small and Medium-scale Enterprise
- 5.3.2. Large-Scale Enterprise
- 5.4. Market Analysis, Insights and Forecast - by End User
- 5.4.1. Banking, Financial Services, and Insurance
- 5.4.2. IT and Telecommunications
- 5.4.3. Government and Defense
- 5.4.4. Healthcare
- 5.4.5. Other End Users
- 5.5. Market Analysis, Insights and Forecast - by Region
- 5.5.1. Latin America
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure Type
- 6. Brazil Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7. Argentina Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8. Mexico Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 9. Peru Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10. Chile Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11. Rest of Latin America Latin America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 12. Competitive Analysis
- 12.1. Market Share Analysis 2024
- 12.2. Company Profiles
- 12.2.1 Ascenty Data Centers E Telecomunicacoes
- 12.2.1.1. Overview
- 12.2.1.2. Products
- 12.2.1.3. SWOT Analysis
- 12.2.1.4. Recent Developments
- 12.2.1.5. Financials (Based on Availability)
- 12.2.2 Constructora Sudamericana S A
- 12.2.2.1. Overview
- 12.2.2.2. Products
- 12.2.2.3. SWOT Analysis
- 12.2.2.4. Recent Developments
- 12.2.2.5. Financials (Based on Availability)
- 12.2.3 Fortis Construction
- 12.2.3.1. Overview
- 12.2.3.2. Products
- 12.2.3.3. SWOT Analysis
- 12.2.3.4. Recent Developments
- 12.2.3.5. Financials (Based on Availability)
- 12.2.4 Equnix Inc *List Not Exhaustive
- 12.2.4.1. Overview
- 12.2.4.2. Products
- 12.2.4.3. SWOT Analysis
- 12.2.4.4. Recent Developments
- 12.2.4.5. Financials (Based on Availability)
- 12.2.5 Aceco TI
- 12.2.5.1. Overview
- 12.2.5.2. Products
- 12.2.5.3. SWOT Analysis
- 12.2.5.4. Recent Developments
- 12.2.5.5. Financials (Based on Availability)
- 12.2.6 Delta Group
- 12.2.6.1. Overview
- 12.2.6.2. Products
- 12.2.6.3. SWOT Analysis
- 12.2.6.4. Recent Developments
- 12.2.6.5. Financials (Based on Availability)
- 12.2.7 Turner Construction Co
- 12.2.7.1. Overview
- 12.2.7.2. Products
- 12.2.7.3. SWOT Analysis
- 12.2.7.4. Recent Developments
- 12.2.7.5. Financials (Based on Availability)
- 12.2.8 ZFB Group
- 12.2.8.1. Overview
- 12.2.8.2. Products
- 12.2.8.3. SWOT Analysis
- 12.2.8.4. Recent Developments
- 12.2.8.5. Financials (Based on Availability)
- 12.2.9 DPR Construction Inc
- 12.2.9.1. Overview
- 12.2.9.2. Products
- 12.2.9.3. SWOT Analysis
- 12.2.9.4. Recent Developments
- 12.2.9.5. Financials (Based on Availability)
- 12.2.10 HostDime Brasil
- 12.2.10.1. Overview
- 12.2.10.2. Products
- 12.2.10.3. SWOT Analysis
- 12.2.10.4. Recent Developments
- 12.2.10.5. Financials (Based on Availability)
- 12.2.11 AECOM Limited
- 12.2.11.1. Overview
- 12.2.11.2. Products
- 12.2.11.3. SWOT Analysis
- 12.2.11.4. Recent Developments
- 12.2.11.5. Financials (Based on Availability)
- 12.2.12 Legrand
- 12.2.12.1. Overview
- 12.2.12.2. Products
- 12.2.12.3. SWOT Analysis
- 12.2.12.4. Recent Developments
- 12.2.12.5. Financials (Based on Availability)
- 12.2.13 CyrusOne Inc
- 12.2.13.1. Overview
- 12.2.13.2. Products
- 12.2.13.3. SWOT Analysis
- 12.2.13.4. Recent Developments
- 12.2.13.5. Financials (Based on Availability)
- 12.2.14 RITTAL Sistemas Eletromecânicos Ltda (Rittal GmbH & Co KG)
- 12.2.14.1. Overview
- 12.2.14.2. Products
- 12.2.14.3. SWOT Analysis
- 12.2.14.4. Recent Developments
- 12.2.14.5. Financials (Based on Availability)
- 12.2.1 Ascenty Data Centers E Telecomunicacoes
List of Figures
- Figure 1: Latin America Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Latin America Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Latin America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Latin America Data Center Construction Market Revenue Million Forecast, by Infrastructure Type 2019 & 2032
- Table 3: Latin America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 4: Latin America Data Center Construction Market Revenue Million Forecast, by Size of Enterprise 2019 & 2032
- Table 5: Latin America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 6: Latin America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 7: Latin America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 8: Brazil Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 9: Argentina Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 10: Mexico Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 11: Peru Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 12: Chile Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 13: Rest of Latin America Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 14: Latin America Data Center Construction Market Revenue Million Forecast, by Infrastructure Type 2019 & 2032
- Table 15: Latin America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 16: Latin America Data Center Construction Market Revenue Million Forecast, by Size of Enterprise 2019 & 2032
- Table 17: Latin America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 18: Latin America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 19: Brazil Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 20: Argentina Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 21: Chile Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 22: Colombia Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 23: Mexico Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 24: Peru Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 25: Venezuela Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 26: Ecuador Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 27: Bolivia Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 28: Paraguay Latin America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Latin America Data Center Construction Market?
The projected CAGR is approximately > 8.71%.
2. Which companies are prominent players in the Latin America Data Center Construction Market?
Key companies in the market include Ascenty Data Centers E Telecomunicacoes, Constructora Sudamericana S A, Fortis Construction, Equnix Inc *List Not Exhaustive, Aceco TI, Delta Group, Turner Construction Co, ZFB Group, DPR Construction Inc, HostDime Brasil, AECOM Limited, Legrand, CyrusOne Inc, RITTAL Sistemas Eletromecânicos Ltda (Rittal GmbH & Co KG).
3. What are the main segments of the Latin America Data Center Construction Market?
The market segments include Infrastructure Type, Tier Type, Size of Enterprise, End User.
4. Can you provide details about the market size?
The market size is estimated to be USD 5.14 Million as of 2022.
5. What are some drivers contributing to market growth?
Growth in Network Connectivity and Increased Adoption of Digital Transformation Related Technologies in the Region; Favorable tax Incentive Structure Introduced by Local Governments has Led to the Higher Participation from International Players; Ongoing Consolidation Efforts by Major Data Center Construction Companies to Aid their Expansion Activities; Growing Awareness on Modular Deployments and Increasing Rack Density.
6. What are the notable trends driving market growth?
IT and Telecommunications Segment to Hold a Significant Share of the Market.
7. Are there any restraints impacting market growth?
Integration issues with traditional systems; Data quality and accuracy issues.
8. Can you provide examples of recent developments in the market?
January 2023: The Santos Port Authority (SPA) is planning to have a new data center constructed by the Brazilian company Zeittec. Zeittec and the SPA, the state-owned organization in charge of running the Port of Santos in the state of So Paulo, have agreed to the terms of a building agreement for a new data center. It is anticipated that work on the Safe Room will begin in January and be finished in the middle of 2023. According to the firm, the SPA Safe Room will be safe from both break-ins and fires thanks to walls that have been certified by NBR 10.636 as being able to resist fire for up to 120 minutes (CF 120). It will have OM4 laser multimode optical fibers and CAT 6A structured cabling.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 4750, USD 4950, and USD 6800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Latin America Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Latin America Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Latin America Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Latin America Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence