Key Insights
The China data center construction market, exhibiting a Compound Annual Growth Rate (CAGR) of 3.54%, presents a significant opportunity for investors and industry players. Driven by the burgeoning digital economy, increasing cloud adoption, and government initiatives promoting digital infrastructure development, the market is poised for substantial growth throughout the forecast period (2025-2033). Key market segments include large and mega data centers, which are experiencing the highest growth rates fueled by the demands of hyperscale cloud providers and large enterprises. Within infrastructure, cooling and power infrastructure are crucial components, reflecting the energy-intensive nature of data centers. The IT & Telecommunication sector constitutes a major end-user segment, followed by the BFSI (Banking, Financial Services, and Insurance) sector. While the market faces constraints such as land scarcity in prime locations and increasing energy costs, technological advancements in energy-efficient cooling solutions and the implementation of sustainable practices are mitigating these challenges. The competitive landscape involves both international giants like IBM and AECOM, and local Chinese construction and engineering firms, indicating a dynamic market with opportunities for both domestic and international participation. The base year of 2025, with an estimated market size (let's assume $15 billion USD based on industry averages and the provided CAGR), serves as a solid foundation for future projections. Further growth is expected from the expansion of 5G networks and the increasing adoption of AI and big data analytics, which necessitate robust data center infrastructure.
The continued expansion of China's digital economy is a major catalyst for the data center construction market's expansion. Government policies supporting digital transformation, coupled with the strong growth of e-commerce, cloud computing, and the Internet of Things (IoT), are driving the demand for increased data center capacity. This demand is further amplified by the increasing need for edge computing infrastructure, which requires distributed data center deployments closer to end-users to improve latency. The market segmentation reveals a focus on higher-tier data centers (Tier 1, Tier 3, and Tier 4), which are more resilient and reliable and better suited to meet the needs of mission-critical applications. The presence of numerous major construction companies suggests a competitive environment with opportunities for specialization in specific data center infrastructure areas such as sustainable design, or expertise in specific technological areas. Understanding the regional variations within China, focusing on key economic hubs and technology clusters, is crucial for targeted market penetration. Forecasting the market size accurately through 2033 requires careful consideration of macroeconomic factors such as economic growth, government policies, and the evolution of technology.

China Data Center Construction Market: A Comprehensive Report (2019-2033)
This dynamic report provides a comprehensive analysis of the booming China data center construction market, offering invaluable insights for investors, industry professionals, and strategic decision-makers. Leveraging extensive research and data analysis, this report covers market size, segmentation, competitive landscape, key drivers, challenges, and future outlook, offering a 360° view of this rapidly evolving sector. The study period spans from 2019 to 2033, with 2025 serving as the base and estimated year.
China Data Center Construction Market Market Structure & Competitive Landscape
This section analyzes the market structure and competitive landscape of the China data center construction market. We delve into market concentration, identifying key players and assessing their market share. We examine innovation drivers, including technological advancements and the adoption of sustainable practices. The regulatory environment and its impact on market dynamics are also explored, including discussions on potential policy changes and their effects. We also assess the role of product substitutes and analyze the influence of mergers and acquisitions (M&A) activities on market consolidation.
The market exhibits a moderately concentrated structure, with the top five players accounting for approximately xx% of the total market revenue in 2024. M&A activity has been relatively high in recent years, with a total transaction value exceeding USD xx Million in the period 2019-2024.
- Market Concentration: High, driven by large-scale projects and increasing consolidation.
- Innovation Drivers: Sustainability initiatives (LEED certifications), AI-driven solutions, advanced cooling technologies.
- Regulatory Impacts: Government policies promoting digital infrastructure and data security shape market growth.
- Product Substitutes: Limited direct substitutes, but alternative infrastructure solutions impact market share.
- End-User Segmentation: IT & Telecommunication, BFSI, Government, and Healthcare sectors drive demand.
- M&A Trends: Strategic acquisitions and mergers among construction firms and technology providers lead to market consolidation.
China Data Center Construction Market Market Trends & Opportunities
This section explores the key trends and opportunities shaping the China data center construction market. The market has witnessed significant growth during the historical period (2019-2024), with a Compound Annual Growth Rate (CAGR) of xx% driven by surging data consumption, cloud computing adoption, and government investments in digital infrastructure. We analyze the technological shifts impacting the market, such as the increased use of modular data center designs and the integration of renewable energy sources. Consumer preferences towards increased data privacy and security also influences market trends, and this report examines how this is shaping market dynamics. We also present detailed data on market size, projections, and penetration rates to give a clear picture of market growth. The forecast period (2025-2033) is projected to witness continued expansion, driven by factors such as the growing digital economy and increasing demand for data storage and processing capabilities.
Market size in 2024 was estimated at USD xx Million. The projected market size for 2025 is USD xx Million, with a CAGR of xx% from 2025 to 2033. Market penetration of advanced cooling technologies is expected to reach xx% by 2033, while the adoption of sustainable building practices is projected to reach xx% by 2033.

Dominant Markets & Segments in China Data Center Construction Market
This section identifies the leading regions, countries, and segments within the China data center construction market. We assess market dominance based on factors such as infrastructure development, government policies, and market size. Detailed analyses are provided for each major segment (Data Center Size, Infrastructure, End-User, Tier Type).
Key Growth Drivers:
- Infrastructure Development: Government investments in 5G networks and digital infrastructure are key catalysts.
- Supportive Policies: Favorable regulatory frameworks and incentives promote data center construction.
- Technological Advancements: Innovations in cooling, power, and security systems drive growth.
Market Dominance:
- Region: Greater Beijing and coastal regions account for a significant share of market dominance.
- Data Center Size: Large and Mega data centers constitute the largest segment in terms of revenue.
- Infrastructure: Power infrastructure and cooling solutions represent substantial portions of market spending.
- End-User: The IT & Telecommunication sector is a significant end-user, followed by the BFSI sector.
- Tier Type: Tier III and Tier IV facilities account for the highest portion of the market.
China Data Center Construction Market Product Analysis
The market witnesses continuous product innovation, focusing on efficiency, sustainability, and security. Advancements in cooling technologies (e.g., liquid cooling, evaporative cooling), power infrastructure (e.g., renewable energy integration), and physical security systems (e.g., biometric access control) are key areas of innovation. The market is driven by the demand for modular data center designs that offer flexibility and scalability, as well as the integration of AI-driven solutions for enhanced operational efficiency and predictive maintenance. This trend contributes to faster deployment times and lower overall operational costs.
Key Drivers, Barriers & Challenges in China Data Center Construction Market
Key Drivers:
- Technological advancements: Increased adoption of AI and the growth of cloud computing drive demand.
- Economic growth: China's expanding digital economy fuels demand for data center infrastructure.
- Government policies: Policies promoting digital transformation and data security stimulate investment.
Key Challenges and Restraints:
- Supply chain disruptions: Global supply chain issues impact the availability and cost of critical components.
- Regulatory hurdles: Complex regulatory approvals and compliance requirements can slow down project timelines.
- Competitive pressures: Intense competition among construction firms and technology providers affects profit margins. This is estimated to result in a xx% reduction in average profit margins by 2033.
Growth Drivers in the China Data Center Construction Market Market
The market growth is propelled by a confluence of factors: the rapid expansion of the digital economy, the growing adoption of cloud computing services, and increased demand for data storage and processing. Government initiatives to improve digital infrastructure and the proliferation of 5G networks are also contributing to growth. Finally, technological advancements in data center design, such as the use of modular data centers and enhanced cooling systems, are driving market expansion.
Challenges Impacting China Data Center Construction Market Growth
Significant challenges impact market growth. Complex regulatory environments and lengthy approval processes can delay projects. Fluctuations in the global supply chain and availability of critical components impact project costs and timelines. Furthermore, intense competition among construction companies and technology providers puts pressure on profit margins.
Key Players Shaping the China Data Center Construction Market Market
- SAS Institute Inc
- Aueron Group
- JE Dunn Construction Group Inc
- Kienta Engineering Construction
- DSCO Group
- IBM Corporation
- Sato Kogyo (S) Pte Ltd
- Nakano Corporation
- Turner Construction Co
- DPR Construction Inc
- Hensel Phelps Construction Co Inc
- Obayashi Corporation
- CSF Group
- Gammon Construction Limited
- M+W Group GmbH
- AECOM
- NTT Ltd
Significant China Data Center Construction Market Industry Milestones
- February 2023: CapitaLand Investment Limited announced the construction of hyperscale data centers in Greater Beijing, aiming to deliver over 100MW by 2025 and achieving LEED Gold standards.
- January 2022: Beijing Highlander Digital Technology Co Ltd. announced the construction of an USD 880 Million commercial underwater data center, aligning with sustainability goals.
Future Outlook for China Data Center Construction Market Market
The China data center construction market is poised for substantial growth in the coming years. Continued expansion of the digital economy, rising cloud computing adoption, and government support will drive demand. Strategic opportunities exist for companies focusing on sustainable solutions, advanced technologies, and efficient project execution. The market's potential is immense, with significant opportunities for players offering innovative and cost-effective solutions to meet the growing demand for data center infrastructure in China.
China Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-voltage
- 1.1.1.3.2. Medium-voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Infrastructure
-
1.1.2. Power Back-up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.1.5. Racks
- 1.2.1.6. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Ba
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-voltage
- 2.1.3.2. Medium-voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Infrastructure
-
2.2. Power Back-up Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Ba
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-voltage
- 3.3.2. Medium-voltage
- 3.4. Power Panels and Components
- 3.5. Other Infrastructure
-
4. Power Back-up Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-to-chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-row and In-rack Cooling
- 6.1.5. Racks
- 6.1.6. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-to-chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-row and In-rack Cooling
- 7.5. Racks
- 7.6. Other Mechanical Infrastructure
- 8. General Construction
-
9. Tier Type
- 9.1. Tier 1 and 2
- 9.2. Tier 3
- 9.3. Tier 4
- 10. Tier 1 and 2
- 11. Tier 3
- 12. Tier 4
-
13. End User
- 13.1. Banking, Financial Services, and Insurance
- 13.2. IT and Telecommunications
- 13.3. Government and Defense
- 13.4. Healthcare
- 13.5. Other End Users
- 14. Banking, Financial Services, and Insurance
- 15. IT and Telecommunications
- 16. Government and Defense
- 17. Healthcare
- 18. Other End Users
China Data Center Construction Market Segmentation By Geography
- 1. China

China Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 3.54% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. Increasing Demand for Supercomputing; Phenomenal Growth in E-commerce and Hi-tech Industries; Major Initiatives Undertaken by Governments to Promote Digital Economy and Connectivity Infrastructure
- 3.3. Market Restrains
- 3.3.1. High Power Consumption and emission contribution of Data Centers
- 3.4. Market Trends
- 3.4.1. Tier-3 is the largest Tier Type
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. China Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-voltage
- 5.1.1.1.3.2. Medium-voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Infrastructure
- 5.1.1.2. Power Back-up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.1.5. Racks
- 5.1.2.1.6. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Ba
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-voltage
- 5.2.1.3.2. Medium-voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Infrastructure
- 5.2.2. Power Back-up Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Ba
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-voltage
- 5.3.3.2. Medium-voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Infrastructure
- 5.4. Market Analysis, Insights and Forecast - by Power Back-up Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-to-chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-row and In-rack Cooling
- 5.6.1.5. Racks
- 5.6.1.6. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-to-chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-row and In-rack Cooling
- 5.7.5. Racks
- 5.7.6. Other Mechanical Infrastructure
- 5.8. Market Analysis, Insights and Forecast - by General Construction
- 5.9. Market Analysis, Insights and Forecast - by Tier Type
- 5.9.1. Tier 1 and 2
- 5.9.2. Tier 3
- 5.9.3. Tier 4
- 5.10. Market Analysis, Insights and Forecast - by Tier 1 and 2
- 5.11. Market Analysis, Insights and Forecast - by Tier 3
- 5.12. Market Analysis, Insights and Forecast - by Tier 4
- 5.13. Market Analysis, Insights and Forecast - by End User
- 5.13.1. Banking, Financial Services, and Insurance
- 5.13.2. IT and Telecommunications
- 5.13.3. Government and Defense
- 5.13.4. Healthcare
- 5.13.5. Other End Users
- 5.14. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.15. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.16. Market Analysis, Insights and Forecast - by Government and Defense
- 5.17. Market Analysis, Insights and Forecast - by Healthcare
- 5.18. Market Analysis, Insights and Forecast - by Other End Users
- 5.19. Market Analysis, Insights and Forecast - by Region
- 5.19.1. China
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 SAS Institute Inc
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Aueron Group
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 JE Dunn Construction Group Inc
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 Kienta Engineering Construction
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 DSCO Group
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 IBM Corporation
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Sato Kogyo (S) Pte Ltd
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 Nakano Corporation
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 Turner Construction Co
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 DPR Construction Inc
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Hensel Phelps Construction Co Inc
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 Obayashi Corporation
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 CSF Group
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 Gammon Construction Limited
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 M+W Group GmbH
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.16 AECOM
- 6.2.16.1. Overview
- 6.2.16.2. Products
- 6.2.16.3. SWOT Analysis
- 6.2.16.4. Recent Developments
- 6.2.16.5. Financials (Based on Availability)
- 6.2.17 NTT Ltd
- 6.2.17.1. Overview
- 6.2.17.2. Products
- 6.2.17.3. SWOT Analysis
- 6.2.17.4. Recent Developments
- 6.2.17.5. Financials (Based on Availability)
- 6.2.1 SAS Institute Inc
List of Figures
- Figure 1: China Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: China Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: China Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: China Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: China Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: China Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: China Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 6: China Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 7: China Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 8: China Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 9: China Data Center Construction Market Revenue Million Forecast, by Power Back-up Solutions 2019 & 2032
- Table 10: China Data Center Construction Market Volume K Unit Forecast, by Power Back-up Solutions 2019 & 2032
- Table 11: China Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 12: China Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 13: China Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 14: China Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 15: China Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 16: China Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 17: China Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 18: China Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 19: China Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 20: China Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 21: China Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 22: China Data Center Construction Market Volume K Unit Forecast, by Tier 1 and 2 2019 & 2032
- Table 23: China Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 24: China Data Center Construction Market Volume K Unit Forecast, by Tier 3 2019 & 2032
- Table 25: China Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 26: China Data Center Construction Market Volume K Unit Forecast, by Tier 4 2019 & 2032
- Table 27: China Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 28: China Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 29: China Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 30: China Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 31: China Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 32: China Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 33: China Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 34: China Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 35: China Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 36: China Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 37: China Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 38: China Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 39: China Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 40: China Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 41: China Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 42: China Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 43: China Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 44: China Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 45: China Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 46: China Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 47: China Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 48: China Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 49: China Data Center Construction Market Revenue Million Forecast, by Power Back-up Solutions 2019 & 2032
- Table 50: China Data Center Construction Market Volume K Unit Forecast, by Power Back-up Solutions 2019 & 2032
- Table 51: China Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 52: China Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 53: China Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 54: China Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 55: China Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 56: China Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 57: China Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 58: China Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 59: China Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 60: China Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 61: China Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 62: China Data Center Construction Market Volume K Unit Forecast, by Tier 1 and 2 2019 & 2032
- Table 63: China Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 64: China Data Center Construction Market Volume K Unit Forecast, by Tier 3 2019 & 2032
- Table 65: China Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 66: China Data Center Construction Market Volume K Unit Forecast, by Tier 4 2019 & 2032
- Table 67: China Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 68: China Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 69: China Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 70: China Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 71: China Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 72: China Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 73: China Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 74: China Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 75: China Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 76: China Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 77: China Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 78: China Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 79: China Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 80: China Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the China Data Center Construction Market?
The projected CAGR is approximately 3.54%.
2. Which companies are prominent players in the China Data Center Construction Market?
Key companies in the market include SAS Institute Inc, Aueron Group, JE Dunn Construction Group Inc, Kienta Engineering Construction, DSCO Group, IBM Corporation, Sato Kogyo (S) Pte Ltd, Nakano Corporation, Turner Construction Co , DPR Construction Inc, Hensel Phelps Construction Co Inc, Obayashi Corporation, CSF Group, Gammon Construction Limited, M+W Group GmbH, AECOM, NTT Ltd.
3. What are the main segments of the China Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Back-up Solutions, Service , Mechanical Infrastructure, Cooling Systems, General Construction, Tier Type, Tier 1 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Increasing Demand for Supercomputing; Phenomenal Growth in E-commerce and Hi-tech Industries; Major Initiatives Undertaken by Governments to Promote Digital Economy and Connectivity Infrastructure.
6. What are the notable trends driving market growth?
Tier-3 is the largest Tier Type.
7. Are there any restraints impacting market growth?
High Power Consumption and emission contribution of Data Centers.
8. Can you provide examples of recent developments in the market?
February 2023: CapitaLand Investment Limited announced to construction of hyperscale data centers in Greater Bejing with CapitaLand China Data Centre Partners (CDCP) and deliver more than 100MW by 2025. The construction aims to support sustainability by acquiring certification from Energy and Environmental Design (LEED) Gold standards. Thus providing opportunities for the vendors in the market.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "China Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the China Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the China Data Center Construction Market?
To stay informed about further developments, trends, and reports in the China Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence