Key Insights
The Denmark data center construction market, exhibiting a robust Compound Annual Growth Rate (CAGR) of 12.44% from 2019-2024, is poised for continued expansion through 2033. Driven by increasing digitalization across sectors like IT & Telecommunications, BFSI (Banking, Financial Services, and Insurance), and the government, the demand for advanced data center infrastructure is surging. This demand is further fueled by the growing adoption of cloud computing, big data analytics, and the Internet of Things (IoT), requiring substantial investments in cooling, power, and networking infrastructure. The market is segmented by data center size (small to massive), infrastructure type (cooling, power, security, etc.), and end-user industry. The presence of significant players like IBM, Schneider Electric, and Arup Group, alongside local firms like Per Aarsleff A/S and Caverion Corporation, indicates a competitive yet dynamic landscape. While specific market size figures for individual years are not provided, a conservative estimate based on the CAGR and a 2025 market value (assumed to be in the range of €100-200 million based on similar sized markets) suggests a substantial market opportunity for both established and emerging players.
The market's growth, however, is not without challenges. Potential restraints could include the high initial investment costs associated with data center construction, stringent regulatory compliance requirements, and potential limitations in skilled labor availability. To capitalize on the opportunities, companies should focus on innovative solutions addressing energy efficiency, sustainability concerns, and robust security measures. The growing focus on sustainability in the construction industry offers an additional avenue for growth for companies offering eco-friendly solutions for data center construction. The market segmentation provides opportunities for specialized players to cater to specific needs within the sector. The consistent growth trajectory suggests a promising outlook for the Danish data center construction market, especially considering the expanding digital economy and the nation's commitment to technological advancements.

Denmark Data Center Construction Market: A Comprehensive Report (2019-2033)
This dynamic report provides a detailed analysis of the Denmark data center construction market, offering invaluable insights for investors, industry professionals, and strategic decision-makers. The report covers the period 2019-2033, with a base year of 2025 and a forecast period spanning 2025-2033. Leveraging extensive data and expert analysis, this comprehensive resource will equip you with the knowledge to navigate the complexities of this rapidly evolving market. Market size is projected to reach xx Million by 2033.
Denmark Data Center Construction Market Market Structure & Competitive Landscape
The Denmark data center construction market exhibits a moderately concentrated structure, with several large multinational companies and a number of regional players competing for market share. The market concentration ratio (CR4) is estimated at xx%, indicating a presence of both large players and smaller niche businesses.
Key Market Dynamics:
- Innovation Drivers: The increasing demand for high-performance computing, cloud services, and 5G infrastructure are driving innovation in cooling technologies, power efficiency, and modular data center designs. The adoption of AI and machine learning in data center management further fuels innovation.
- Regulatory Impacts: Government initiatives promoting digitalization and investment in renewable energy sources are shaping the market. Regulations related to energy efficiency, security, and environmental sustainability influence design choices and operational practices.
- Product Substitutes: While traditional on-premise data centers remain dominant, the rise of cloud computing and colocation services presents a degree of substitution. However, the demand for customized solutions and specialized applications will sustain the need for traditional data center construction.
- End-User Segmentation: The IT & Telecommunication sector is the largest end-user segment, followed by BFSI (Banking, Financial Services, and Insurance) and Government. Healthcare and other end-users are also showing increasing demand for data center capacity.
- M&A Trends: Recent mergers and acquisitions, like the Penta Infra acquisition of Sentia Denmark's data center in 2021, highlight the consolidation trend within the market. The overall M&A volume for the period 2019-2024 was xx deals, with a total value of xx Million. This trend is expected to continue as larger players seek to expand their market share and geographic reach.
Denmark Data Center Construction Market Market Trends & Opportunities
The Denmark data center construction market is experiencing robust growth, driven by increasing data volumes, digital transformation initiatives across various sectors, and the government's commitment to developing a robust digital infrastructure. The market is expected to achieve a Compound Annual Growth Rate (CAGR) of xx% during the forecast period (2025-2033). Market penetration rates for various infrastructure components are as follows: Cooling Infrastructure (xx%), Power Infrastructure (xx%), Racks and Cabinets (xx%), Servers (xx%), Networking Equipment (xx%), Physical Security Infrastructure (xx%), Design and Consulting Services (xx%), and Other Infrastructure (xx%).
Technological advancements, such as the adoption of edge computing and AI-powered data center management systems, are reshaping the market landscape. Growing preference for sustainable and energy-efficient data centers is further shaping the industry. Increasing cloud adoption and the growing number of hyperscale data centers are driving demand for large and mega-sized facilities. Competitive dynamics are characterized by ongoing investments in capacity expansion, strategic partnerships, and technological differentiation.

Dominant Markets & Segments in Denmark Data Center Construction Market
The Copenhagen region is the dominant market within Denmark, owing to its well-established IT infrastructure, connectivity to international fiber optic networks, and the concentration of major technology companies. Within the segmentation analysis:
- Tier Type: Tier 1 data centers represent the largest segment, driven by their resilience and high availability requirements for critical applications.
- Data Center Size: The demand for large and mega-sized data centers is outpacing that of smaller facilities, due to the increasing scale of digital operations.
- Infrastructure: Power Infrastructure, cooling infrastructure, and design and consulting services constitute the largest revenue-generating infrastructure segments.
Key Growth Drivers:
- Robust Digital Infrastructure Development: Government support for digital transformation and its investment in the digital infrastructure are creating favorable market conditions.
- Growing Adoption of Cloud and Hyperscale Services: Increasing reliance on cloud computing by businesses is driving significant demand for large-scale data center facilities.
- Energy-Efficiency Focus: Stringent environmental regulations and the rising cost of energy are promoting the adoption of energy-efficient data center designs and technologies.
Denmark Data Center Construction Market Product Analysis
Product innovations are largely focused on enhancing energy efficiency, improving reliability, and optimizing operational costs. Modular designs, prefabricated components, and AI-powered management systems are gaining traction. These advancements enable faster deployment, reduced construction costs, and increased operational efficiency, enhancing the market fit for diverse applications.
Key Drivers, Barriers & Challenges in Denmark Data Center Construction Market
Key Drivers:
- Increased Data Generation: The exponential growth in data generation across various sectors fuels the need for additional data center capacity.
- Government Support: Government initiatives promoting the digital economy and supporting investments in digital infrastructure provide a significant boost.
- Technological Advancements: Innovations in cooling systems, power management, and security technologies drive market expansion.
Key Challenges:
- Supply Chain Disruptions: Global supply chain uncertainties can impact the availability of critical components, delaying projects and increasing costs. This impact is estimated at xx% in project delays.
- High Land Costs: The cost of land acquisition in strategic locations adds to the overall project expenditure. The impact on project costs is approximately xx%.
- Regulatory Complexity: Navigating various regulatory requirements related to environmental compliance, security, and energy consumption can present challenges for project developers.
Growth Drivers in the Denmark Data Center Construction Market Market
The market is driven by a confluence of factors including the increasing adoption of cloud computing and Big Data analytics, alongside government incentives for data center development and the growing need for reliable, high-speed internet access. The expanding digital economy and the rising demand for robust IT infrastructure in Denmark’s growing business sector further accelerate growth.
Challenges Impacting Denmark Data Center Construction Market Growth
Challenges include securing sufficient funding for large-scale projects, navigating complex permitting procedures, and managing the availability of skilled labor. The potential for power shortages and climate change impacts add further complexity to the industry.
Key Players Shaping the Denmark Data Center Construction Market Market
- Per Aarsleff A/S
- Johnson Controls International PLC
- Caverion Corporation
- IBM Corporation
- Legrand SA
- Kohler Co
- Atos Group
- Rolls-Royce Power Systems
- NetApp Inc
- Castrol Limited
- Schneider Electric SE
- Arista Networks
- DPR CONSTRUCTION INC
- Arup Group Limited
- AECOM
Significant Denmark Data Center Construction Market Industry Milestones
- February 2021: STACK Infrastructure announces the acquisition of a 110,000 m2 plot of land for a new data center campus in Denmark, planned to include five 6MW IT load data centers. This signifies a major investment in Denmark's data center capacity.
- June 2021: Penta Infra acquires Sentia Denmark's data center in Glostrup, marking its entry into the Nordic data center market. This acquisition highlights the increasing consolidation within the European data center sector.
Future Outlook for Denmark Data Center Construction Market Market
The Denmark data center construction market is poised for continued growth, driven by increasing digitalization, government support, and investments from global players. Strategic opportunities exist for companies specializing in sustainable and energy-efficient data center solutions, advanced cooling technologies, and modular data center designs. The market's strong fundamentals and positive growth trajectory present attractive prospects for investors and industry players alike.
Denmark Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-voltage
- 1.1.1.3.2. Medium-voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Others
-
1.1.2. Power Back-up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. By Electrical Infrastructure
-
2. Tier Type
- 2.1. Tier 1 and 2
- 2.2. Tier 3
- 2.3. Tier 4
-
3. End User
- 3.1. Banking, Financial Services, and Insurance
- 3.2. IT and Telecommunications
- 3.3. Government and Defense
- 3.4. Healthcare
- 3.5. Other End Users
Denmark Data Center Construction Market Segmentation By Geography
- 1. Denmark

Denmark Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 12.44% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
- 3.3. Market Restrains
- 3.3.1. Security Challenges Impacting Growth of Data Centers
- 3.4. Market Trends
- 3.4.1. IT and Telecom to have significant market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Denmark Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-voltage
- 5.1.1.1.3.2. Medium-voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Others
- 5.1.1.2. Power Back-up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Tier Type
- 5.2.1. Tier 1 and 2
- 5.2.2. Tier 3
- 5.2.3. Tier 4
- 5.3. Market Analysis, Insights and Forecast - by End User
- 5.3.1. Banking, Financial Services, and Insurance
- 5.3.2. IT and Telecommunications
- 5.3.3. Government and Defense
- 5.3.4. Healthcare
- 5.3.5. Other End Users
- 5.4. Market Analysis, Insights and Forecast - by Region
- 5.4.1. Denmark
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 Per Aarsleff A/S
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Johnson Controls International PLC
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 Caverion Corporation
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 IBM Corporation
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 Legrand SA
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Kohler Co
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Atos Group
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 Rolls-Royce Power Systems
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 NetApp Inc
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Castrol Limited
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Schneider Electric SE
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 Arista Networks
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 DPR CONSTRUCTION INC
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 Arup Group Limited
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 AECOM
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.1 Per Aarsleff A/S
List of Figures
- Figure 1: Denmark Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Denmark Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Denmark Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Denmark Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: Denmark Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: Denmark Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: Denmark Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 6: Denmark Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 7: Denmark Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 8: Denmark Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 9: Denmark Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 10: Denmark Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 11: Denmark Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 12: Denmark Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 13: Denmark Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 14: Denmark Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 15: Denmark Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 16: Denmark Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 17: Denmark Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 18: Denmark Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 19: Denmark Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 20: Denmark Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Denmark Data Center Construction Market?
The projected CAGR is approximately 12.44%.
2. Which companies are prominent players in the Denmark Data Center Construction Market?
Key companies in the market include Per Aarsleff A/S, Johnson Controls International PLC, Caverion Corporation, IBM Corporation, Legrand SA, Kohler Co, Atos Group, Rolls-Royce Power Systems, NetApp Inc , Castrol Limited, Schneider Electric SE, Arista Networks, DPR CONSTRUCTION INC, Arup Group Limited, AECOM.
3. What are the main segments of the Denmark Data Center Construction Market?
The market segments include Infrastructure, Tier Type, End User.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades.
6. What are the notable trends driving market growth?
IT and Telecom to have significant market share.
7. Are there any restraints impacting market growth?
Security Challenges Impacting Growth of Data Centers.
8. Can you provide examples of recent developments in the market?
June 2021: Sentia Denmark's data center in Glostrup was acquired by European data center provider Penta Infra. The acquisition of Sentia Danmark's data centers is Penta Infra's first step toward entering the Nordic market. Penta Infra currently manages a number of data centers in the Netherlands and Germany.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Denmark Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Denmark Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Denmark Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Denmark Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence