Key Insights
The Thailand data center construction market is experiencing robust growth, fueled by a burgeoning digital economy, increasing cloud adoption, and government initiatives promoting digital infrastructure development. The market, valued at approximately $XX million in 2025 (assuming a logical estimation based on the provided CAGR and market size), is projected to expand significantly over the forecast period (2025-2033), driven by a Compound Annual Growth Rate (CAGR) of 12.53%. Key drivers include the rising demand for data storage and processing capabilities from sectors like IT & Telecommunications, BFSI (Banking, Financial Services, and Insurance), and government agencies. The increasing penetration of 5G technology and the expansion of e-commerce are further accelerating market expansion. While challenges such as infrastructure limitations and power constraints exist, the strong government support and private sector investments are mitigating these obstacles. The market segmentation reveals a diversified landscape, with varying demands across different end-user sectors, infrastructure types (electrical and mechanical), data center sizes (small to mega), and tier levels. Companies like Equinix Inc., NTT Communications Corporation, and local players are actively shaping the market landscape through investments in new facilities and expansion projects. The strategic location of Thailand as a regional hub for Southeast Asia further enhances its attractiveness for data center investment.
The projected growth trajectory for the Thailand data center construction market indicates substantial opportunities for both domestic and international players. The market's segmentation allows for targeted strategies, catering to the specific needs of each sector. While competition is likely to intensify, the overall market outlook remains positive due to the sustained demand for advanced data storage and processing infrastructure. Future growth will depend on effective addressing of infrastructural challenges, sustained government support, and successful implementation of digital transformation initiatives across various sectors. This comprehensive market expansion hinges on several factors, including successful investments in renewable energy sources to power data centers sustainably, continued development of robust telecommunication infrastructure to support high-bandwidth connectivity, and the adaptation of stringent data privacy and security regulations to foster investor confidence.

Thailand Data Center Construction Market: A Comprehensive Report (2019-2033)
This dynamic report provides an in-depth analysis of the burgeoning Thailand data center construction market, offering invaluable insights for investors, industry professionals, and strategic decision-makers. With a comprehensive study period spanning 2019-2033, including a base year of 2025 and a forecast period of 2025-2033, this report leverages extensive data and expert analysis to deliver a clear understanding of market trends, opportunities, and challenges. The market is projected to reach xx Million by 2033, exhibiting a CAGR of xx% during the forecast period.
Thailand Data Center Construction Market Structure & Competitive Landscape
The Thailand data center construction market is characterized by a moderately concentrated landscape, with a few major players holding significant market share. However, increasing foreign investment and the rise of hyperscale data centers are driving market fragmentation. Innovation is fueled by the demand for higher energy efficiency, improved security, and advanced cooling technologies. Government regulations, particularly around data sovereignty and cybersecurity, play a crucial role in shaping market dynamics. Product substitutes, such as edge computing solutions, are emerging, but the core need for large-scale data centers remains strong. The market has witnessed a moderate level of M&A activity, with xx major transactions recorded between 2019 and 2024, representing a total value of approximately xx Million. Key players are aggressively pursuing strategic partnerships and acquisitions to expand their presence and capabilities.
- Market Concentration: The Herfindahl-Hirschman Index (HHI) for the market is estimated to be xx in 2024, indicating a moderately concentrated market.
- Innovation Drivers: Demand for higher energy efficiency, advanced cooling solutions (liquid cooling, free air cooling), and improved security features (biometric access control, advanced intrusion detection).
- Regulatory Impacts: Government policies on data localization and cybersecurity are major influencing factors impacting investment decisions and market expansion.
- M&A Trends: Consolidation is expected to continue as larger players seek to acquire smaller companies with specialized expertise or strategic locations.
Thailand Data Center Construction Market Trends & Opportunities
The Thailand data center construction market is experiencing robust growth driven by the increasing adoption of cloud computing, the expansion of digital services, and the government's push for digital transformation. The market size is projected to reach xx Million by 2025 and xx Million by 2033, fueled by a compound annual growth rate (CAGR) of xx%. This expansion is driven by several key factors: escalating demand for data storage and processing from various sectors, ongoing infrastructure development, and favorable government policies supporting digital economy initiatives. The increasing adoption of 5G technology and the expansion of the Internet of Things (IoT) are further accelerating market growth. Competitive dynamics are characterized by intense rivalry among established players and the emergence of new entrants, prompting ongoing innovation and cost optimization strategies. Market penetration rates are expected to increase significantly across various sectors, with the IT & Telecommunication sector leading the charge.

Dominant Markets & Segments in Thailand Data Center Construction Market
The IT & Telecommunication sector is the dominant end-user segment in the Thailand data center construction market, accounting for approximately xx% of the market share in 2024. This is closely followed by the BFSI sector. Among infrastructure types, Electrical Infrastructure commands a significant portion of the market, reflecting the critical role of power supply and distribution in data center operations. Large and Mega data centers are driving significant growth within the By DC Size segment. Tier III and Tier IV data centers represent the dominant Tier types, showcasing the demand for high availability and resilience.
Key Growth Drivers:
- Robust economic growth: Thailand's consistent economic expansion fuels demand for IT infrastructure.
- Government support for digital transformation: Initiatives aimed at fostering digital infrastructure development.
- Expanding digital economy: Growing adoption of e-commerce, cloud services, and digital entertainment.
- Investment in 5G infrastructure: Facilitates higher data demands and supports the growth of IoT devices.
Market Dominance Analysis: The Bangkok Metropolitan Region remains the dominant region due to its concentration of businesses and IT infrastructure.
Thailand Data Center Construction Market Product Analysis
The market exhibits a diverse range of data center products, encompassing modular data centers, prefabricated units, and customized solutions. These products are designed to cater to varying client requirements, ranging from small-scale facilities to large hyperscale deployments. Technological advancements focus on improving energy efficiency, enhancing security, and leveraging advanced cooling techniques to maintain optimal operational conditions. The competitive landscape is characterized by ongoing innovation, with companies striving to offer cutting-edge products and superior service to secure market share.
Key Drivers, Barriers & Challenges in Thailand Data Center Construction Market
Key Drivers:
- Technological advancements in data center infrastructure.
- Government initiatives to promote digital transformation.
- Growing demand for cloud computing services across diverse sectors.
Challenges and Restraints:
- High initial capital investment for data center construction.
- Potential supply chain disruptions affecting the procurement of critical components.
- Regulatory complexities and licensing requirements can create hurdles for new entrants.
- Competition from regional and international players intensifies market pressure.
Growth Drivers in the Thailand Data Center Construction Market
Growth in Thailand's data center construction market is fueled by several factors. These include the expanding digital economy, increasing demand for cloud services, and government initiatives promoting digital infrastructure development. Significant foreign direct investment further boosts market expansion. The rising adoption of 5G technology and the growing proliferation of IoT devices are also driving considerable growth.
Challenges Impacting Thailand Data Center Construction Market Growth
Significant challenges impact the Thailand data center construction market. These include the high upfront capital expenditure, potential supply chain disruptions that could impact construction timelines and costs, and regulatory hurdles that could delay projects. Competition from established players and the need for skilled labor add to the challenges.
Key Players Shaping the Thailand Data Center Construction Market
- Space DC Pte Ltd
- DTPNet
- Project Planning Service
- NTT Communications Corporation
- XL Axiata Tbk PT (Princeton Digital Group)
- Equinix Inc
- Telkomsigma
- GTN Data Center
- TAKNET Systems (Thailand ) Co Ltd
- Arup Group
- Lintasarta
- PT DCI Indonesia (DCI)
- Biznet Networks
- JupiterDC
- PT Faasri Utama Sakti
- Gulf Energy Development Public Company Limited
- Delta Electronics (Thailand)
- Indosat Tbk PT
Significant Thailand Data Center Construction Market Industry Milestones
- February 2023: Singapore Telecom Limited (Singtel), Gulf Energy Development PLC (Gulf), and Advanced Info Services PLC (AIS) announced a joint venture to build a 20 MW capacity data center in Thailand by 2025, to be operated by GSA Data Center Company Limited (GSA). This signifies a significant investment in large-scale data center infrastructure to cater to the growing demand from cloud providers.
Future Outlook for Thailand Data Center Construction Market
The future outlook for the Thailand data center construction market remains positive, with strong growth anticipated over the forecast period. Continued investment in digital infrastructure, coupled with the government's commitment to digital transformation, will propel market expansion. Strategic opportunities exist for companies focusing on sustainable and energy-efficient solutions, catering to the growing demand for environmentally friendly data centers. The market presents a promising landscape for both domestic and international players seeking to capitalize on the region's rapid digital growth.
Thailand Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Distribution Solutions
-
1.1.2. Power Backup Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-Voltage
- 2.1.3.2. Medium-Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Distribution Solutions
-
2.2. Power Backup Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Basic & Smart - Metered & Switched solutions
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-Voltage
- 3.3.2. Medium-Voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Distribution Solutions
-
4. Power Backup Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-To-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-Row and In-Rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-To-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-Row and In-Rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier 2 and 2
- 11.2. Tier 3
- 11.3. Tier 4
- 12. Tier 2 and 2
- 13. Tier 3
- 14. Tier 4
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
Thailand Data Center Construction Market Segmentation By Geography
- 1. Thailand

Thailand Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 12.53% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 9.1 Migration to Cloud by large businesses9.2 Established 'Mobile-First' Landscape Since the Recent Past
- 3.3. Market Restrains
- 3.3.1. 10.1 Shortage of Skilled Professionals Presenting a Challenge for Several Contractors
- 3.4. Market Trends
- 3.4.1. Tier 3 is the Largest Tier Type
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Thailand Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.2. Power Backup Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-Voltage
- 5.2.1.3.2. Medium-Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Distribution Solutions
- 5.2.2. Power Backup Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-Voltage
- 5.3.3.2. Medium-Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Distribution Solutions
- 5.4. Market Analysis, Insights and Forecast - by Power Backup Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-To-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-Row and In-Rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-To-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-Row and In-Rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier 2 and 2
- 5.11.2. Tier 3
- 5.11.3. Tier 4
- 5.12. Market Analysis, Insights and Forecast - by Tier 2 and 2
- 5.13. Market Analysis, Insights and Forecast - by Tier 3
- 5.14. Market Analysis, Insights and Forecast - by Tier 4
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Region
- 5.21.1. Thailand
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 Space DC Pte Ltd
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 DTPNet
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 Project Planning Service
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 NTT Communications Corporation
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 XL Axiata Tbk PT (Princeton Digital Group)
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Equinix Inc
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Telkomsigma
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 GTN Data Center
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 TAKNET Systems (Thailand ) Co Ltd
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Arup Group
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Lintasarta
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 PT DCI Indonesia (DCI)
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 Biznet Networks
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 JupiterDC
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 PT Faasri Utama Sakti
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.16 Gulf Energy Development Public Company Limited
- 6.2.16.1. Overview
- 6.2.16.2. Products
- 6.2.16.3. SWOT Analysis
- 6.2.16.4. Recent Developments
- 6.2.16.5. Financials (Based on Availability)
- 6.2.17 Delta Electronics (Thailand)
- 6.2.17.1. Overview
- 6.2.17.2. Products
- 6.2.17.3. SWOT Analysis
- 6.2.17.4. Recent Developments
- 6.2.17.5. Financials (Based on Availability)
- 6.2.18 Indosat Tbk PT
- 6.2.18.1. Overview
- 6.2.18.2. Products
- 6.2.18.3. SWOT Analysis
- 6.2.18.4. Recent Developments
- 6.2.18.5. Financials (Based on Availability)
- 6.2.1 Space DC Pte Ltd
List of Figures
- Figure 1: Thailand Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Thailand Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Thailand Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Thailand Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 3: Thailand Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 4: Thailand Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 5: Thailand Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 6: Thailand Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 7: Thailand Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 8: Thailand Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 9: Thailand Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 10: Thailand Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 11: Thailand Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 12: Thailand Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 13: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 2 and 2 2019 & 2032
- Table 14: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 15: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 16: Thailand Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 17: Thailand Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 18: Thailand Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 19: Thailand Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 20: Thailand Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 21: Thailand Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 22: Thailand Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 23: Thailand Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 24: Thailand Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 25: Thailand Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 26: Thailand Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 27: Thailand Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 28: Thailand Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 29: Thailand Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 30: Thailand Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 31: Thailand Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 32: Thailand Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 33: Thailand Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 34: Thailand Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 35: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 2 and 2 2019 & 2032
- Table 36: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 37: Thailand Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 38: Thailand Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 39: Thailand Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 40: Thailand Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 41: Thailand Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 42: Thailand Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 43: Thailand Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 44: Thailand Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Thailand Data Center Construction Market?
The projected CAGR is approximately 12.53%.
2. Which companies are prominent players in the Thailand Data Center Construction Market?
Key companies in the market include Space DC Pte Ltd, DTPNet, Project Planning Service, NTT Communications Corporation, XL Axiata Tbk PT (Princeton Digital Group), Equinix Inc, Telkomsigma, GTN Data Center, TAKNET Systems (Thailand ) Co Ltd, Arup Group, Lintasarta, PT DCI Indonesia (DCI), Biznet Networks, JupiterDC, PT Faasri Utama Sakti, Gulf Energy Development Public Company Limited, Delta Electronics (Thailand), Indosat Tbk PT.
3. What are the main segments of the Thailand Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Backup Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier 2 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
9.1 Migration to Cloud by large businesses9.2 Established 'Mobile-First' Landscape Since the Recent Past.
6. What are the notable trends driving market growth?
Tier 3 is the Largest Tier Type.
7. Are there any restraints impacting market growth?
10.1 Shortage of Skilled Professionals Presenting a Challenge for Several Contractors.
8. Can you provide examples of recent developments in the market?
February 2023:Singapore Telecom Limited (Singtel), Gulf Energy Development PLC (Gulf), and Advanced Info Services PLC (AIS), established a joint venture to build a 20 MW capacity data center in Thailand by 2025. This facility will be operated by GSA Data Center Company Limited (GSA). The company aims to match the large-scale data center requirements of cloud players in the country.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Thailand Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Thailand Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Thailand Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Thailand Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence