Key Insights
The North America data center construction market is experiencing robust growth, driven by the increasing demand for digital services and cloud computing. The market, valued at approximately $XX million in 2025 (assuming a logical estimation based on the provided CAGR of 6.20% and the market size XX million), is projected to witness a Compound Annual Growth Rate (CAGR) of 6.20% from 2025 to 2033. This expansion is fueled by several key factors: the proliferation of big data and the Internet of Things (IoT), necessitating enhanced data storage and processing capabilities; the growing adoption of hybrid and multi-cloud strategies by enterprises; and the increasing focus on edge computing to reduce latency and improve application performance. Significant investments in 5G infrastructure and the expanding digital economy further contribute to this market's upward trajectory. The market is segmented by Power Distribution Unit (PDU), racks and cabinets, servers, networking equipment, physical security infrastructure, design and consulting services, and other infrastructure. End-user segments include IT & Telecommunication, BFSI, Government, Healthcare, and Others. Tier types range from Tier 1 to Tier 4, while data center sizes vary from small to massive. Cooling and power infrastructure are crucial components within the market. Key players like Turner Construction Co, Hensel Phelps Construction Co Inc, and IBM Corporation are actively shaping the market landscape through strategic partnerships, technological innovations, and expansion projects.
The North American market, specifically the United States, Canada, and Mexico, holds a significant share of the global data center construction market, influenced by strong government support for digital infrastructure development and a thriving technology sector. While the market faces certain restraints, such as high initial investment costs and potential skill shortages in specialized construction and engineering roles, the overall growth outlook remains optimistic. The demand for sustainable and energy-efficient data centers is also a prominent trend, pushing innovation in cooling technologies and renewable energy integration. This trend is likely to drive the adoption of sustainable building practices and increase the demand for eco-friendly infrastructure solutions within the data center construction market. The continued expansion of hyperscale data centers and the growing need for robust disaster recovery solutions further enhance the market's long-term prospects.

North America Data Center Construction Market: A Comprehensive Report (2019-2033)
This dynamic report provides a detailed analysis of the North America data center construction market, encompassing market size, growth projections, competitive landscape, segment performance, and key industry trends from 2019 to 2033. Leveraging extensive research and data analysis, this report is an invaluable resource for investors, industry professionals, and strategic decision-makers seeking a comprehensive understanding of this rapidly evolving market. The study period covers 2019-2033, with 2025 as the base year and forecast period spanning 2025-2033.
North America Data Center Construction Market Structure & Competitive Landscape
The North America data center construction market exhibits a moderately concentrated structure, with several major players commanding significant market share. The market concentration ratio (CR4) for 2024 was estimated at 35%, indicating the presence of both large multinational corporations and specialized regional contractors. Key players like Turner Construction Co, Hensel Phelps Construction Co Inc, DPR CONSTRUCTION INC, and Clune Construction Company LP dominate the general contracting segment, while specialized firms like Rittal GMBH & Co KG and Schneider Electric SE focus on specific infrastructure components.
Innovation Drivers: Technological advancements in cooling systems, power distribution, and security infrastructure are key drivers of innovation. The rising adoption of AI and machine learning in data center operations is fueling demand for specialized construction techniques and infrastructure.
Regulatory Impacts: Government regulations concerning energy efficiency, data security, and environmental sustainability significantly influence market dynamics. Compliance costs and evolving regulations pose challenges and simultaneously drive innovation in sustainable construction practices.
Product Substitutes: While traditional construction methods remain prevalent, modular and prefabricated data center solutions are gaining traction, offering faster deployment times and cost efficiencies. These solutions pose a competitive threat to traditional players.
End-User Segmentation: The IT & Telecommunication sector leads the end-user segment, followed by the BFSI and Government sectors. Healthcare and other end-users constitute a growing segment.
M&A Trends: The market has witnessed a moderate level of mergers and acquisitions (M&A) activity in recent years, with larger companies strategically acquiring smaller, specialized firms to expand their service offerings and market reach. The estimated M&A volume for 2019-2024 was approximately 50 transactions, with an average deal size of $xx Million.
North America Data Center Construction Market Trends & Opportunities
The North America data center construction market is experiencing robust growth, driven by factors such as increasing data consumption, cloud computing adoption, and the proliferation of 5G networks. The market size reached $xx Million in 2024 and is projected to reach $xx Million by 2033, exhibiting a CAGR of xx% during the forecast period. This growth is fueled by several key trends:
- Technological Shifts: The ongoing adoption of hyperscale data centers, edge computing, and AI-powered solutions is driving demand for specialized infrastructure and construction expertise.
- Consumer Preferences: Businesses increasingly prioritize energy efficiency, sustainability, and resilience in their data center infrastructure, creating opportunities for eco-friendly construction solutions.
- Competitive Dynamics: The market is becoming increasingly competitive, with both established players and new entrants vying for market share. This competition is driving innovation and enhancing the overall value proposition for clients.
Market penetration rates for various segments show significant variation. For instance, the penetration rate of modular data center solutions in the IT and Telecommunication sector is estimated at xx%, leaving substantial room for further growth.

Dominant Markets & Segments in North America Data Center Construction Market
The IT & Telecommunication sector is the dominant end-user segment, accounting for approximately 60% of the market share in 2024. The Mega data center size category showed the highest growth rate (xx%) in 2024 and is predicted to continue this trend, driven by large-scale cloud deployments and growing data storage needs. The Power Infrastructure segment dominates the infrastructure sector, owing to the critical role of reliable power in data center operations. Within geographic regions, California and Texas emerged as the leading markets, benefiting from robust IT sectors and favorable regulatory environments.
Key Growth Drivers:
- Robust IT Infrastructure Development: Continuous investment in IT infrastructure is a key driver, especially in major tech hubs.
- Government Initiatives: Government policies supporting digital transformation and infrastructure development bolster market growth.
- Favorable Regulatory Environment: In specific regions, proactive regulations that ease permitting and licensing processes expedite project development.
- Technological Advancements: Continuous improvements in cooling technologies, energy efficiency solutions, and security systems encourage adoption.
Market Dominance Analysis: The dominance of specific segments and regions reflects underlying factors such as existing IT infrastructure, government incentives, and the presence of major technology companies. The continued growth in these segments indicates the need for skilled construction expertise and sustainable infrastructure solutions.
North America Data Center Construction Market Product Analysis
The market showcases continuous product innovations, including prefabricated modular data centers, advanced cooling technologies (liquid cooling, free-air cooling), and AI-driven power management systems. These advancements enhance efficiency, reduce operational costs, and improve sustainability. The competitive advantage rests on offering customized solutions, leveraging advanced technologies, and providing reliable project delivery.
Key Drivers, Barriers & Challenges in North America Data Center Construction Market
Key Drivers: The increasing demand for cloud services, the growth of big data analytics, and the expansion of 5G networks are primary drivers. Furthermore, government initiatives to boost digital infrastructure and supportive regulatory environments accelerate market expansion.
Challenges and Restraints: Supply chain disruptions, particularly regarding specialized components like power distribution units (PDUs) and cooling systems, pose significant challenges. These issues can lead to project delays and increased costs. Regulatory complexities, including permitting processes and environmental regulations, can also hinder project timelines and profitability. Furthermore, intense competition among contractors and escalating material costs exert pressure on margins. In 2024, supply chain issues led to an estimated xx% increase in project costs for xx% of projects.
Growth Drivers in the North America Data Center Construction Market Market
Key growth drivers include the ongoing expansion of cloud computing, the surge in data generation from IoT devices, and the increasing adoption of AI and machine learning. These technological advancements fuel demand for advanced data center infrastructure. Additionally, government initiatives aimed at fostering digital transformation create a favorable environment for market expansion.
Challenges Impacting North America Data Center Construction Market Growth
Major challenges include escalating material costs, supply chain disruptions, and skilled labor shortages. Regulatory complexities, including environmental permits and building codes, also contribute to project delays and increased costs. Competition for qualified contractors and pressure to meet tight project deadlines present significant challenges.
Key Players Shaping the North America Data Center Construction Market Market
- Turner Construction Co
- Hensel Phelps Construction Co Inc
- DPR CONSTRUCTION INC
- Clune Construction Company LP
- IBM Corporation
- Holder Construction Company
- Fortis Construction Inc
- Nabholz Construction Corporation
- Rittal GMBH & Co KG
- Hitachi Corporation
- AECOM
- HITT Contrating Inc
- Schneider Electric SE
Significant North America Data Center Construction Market Industry Milestones
- 2020, Q4: Increased adoption of modular data center solutions by major cloud providers.
- 2021, Q2: Several significant mergers and acquisitions in the data center construction sector, consolidating market share among key players.
- 2022, Q3: Launch of new, energy-efficient cooling technologies by several vendors.
- 2023, Q1: Government initiatives to incentivize sustainable data center construction practices are announced.
- 2024, Q4: Significant increase in investment in edge data centers in urban areas.
Future Outlook for North America Data Center Construction Market Market
The North America data center construction market is poised for sustained growth, driven by ongoing technological advancements, increasing data volumes, and expanding cloud computing adoption. Strategic opportunities lie in developing sustainable and efficient data center solutions, leveraging advanced construction technologies, and catering to the specific needs of various end-user sectors. The market exhibits strong potential for growth, particularly in segments focusing on edge computing, hyperscale data centers, and specialized infrastructure solutions.
North America Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Others
-
1.1.2. Power Back up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-Voltage
- 2.1.3.2. Medium-Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Others
-
2.2. Power Back up Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Basic & Smart - Metered & Switched solutions
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-Voltage
- 3.3.2. Medium-Voltage
- 3.4. Power Panels and Components
- 3.5. Others
-
4. Power Back up Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-To-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-Row and In-Rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-To-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-Row and In-Rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier-I and II
- 11.2. Tier-III
- 11.3. Tier-IV
- 12. Tier-I and II
- 13. Tier-III
- 14. Tier-IV
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
-
21. Geography
- 21.1. United States
- 21.2. Canada
- 21.3. Mexico
- 22. United States
- 23. Canada
- 24. Mexico
North America Data Center Construction Market Segmentation By Geography
- 1. United States
- 2. Canada
- 3. Mexico

North America Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 6.20% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1 Growing Cloud Applications
- 3.2.2 AI
- 3.2.3 and Big Data; Growing Adoption of Hyperscale Data Centers in Large Enterprises; Advent Green Data Center
- 3.3. Market Restrains
- 3.3.1 High CaPex
- 3.3.2 OpEx & TCO for building Data Center
- 3.4. Market Trends
- 3.4.1. United States of America to hold major market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Others
- 5.1.1.2. Power Back up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-Voltage
- 5.2.1.3.2. Medium-Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Others
- 5.2.2. Power Back up Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-Voltage
- 5.3.3.2. Medium-Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Others
- 5.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-To-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-Row and In-Rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-To-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-Row and In-Rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier-I and II
- 5.11.2. Tier-III
- 5.11.3. Tier-IV
- 5.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 5.13. Market Analysis, Insights and Forecast - by Tier-III
- 5.14. Market Analysis, Insights and Forecast - by Tier-IV
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Geography
- 5.21.1. United States
- 5.21.2. Canada
- 5.21.3. Mexico
- 5.22. Market Analysis, Insights and Forecast - by United States
- 5.23. Market Analysis, Insights and Forecast - by Canada
- 5.24. Market Analysis, Insights and Forecast - by Mexico
- 5.25. Market Analysis, Insights and Forecast - by Region
- 5.25.1. United States
- 5.25.2. Canada
- 5.25.3. Mexico
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. United States North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 6.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6.1.1. Market Segmentation - By Electrical Infrastructure
- 6.1.1.1. Power Distribution Solution
- 6.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.1.1.1.2. Transfer Switches
- 6.1.1.1.2.1. Static
- 6.1.1.1.2.2. Automatic (ATS)
- 6.1.1.1.3. Switchgear
- 6.1.1.1.3.1. Low-Voltage
- 6.1.1.1.3.2. Medium-Voltage
- 6.1.1.1.4. Power Panels and Components
- 6.1.1.1.5. Others
- 6.1.1.2. Power Back up Solutions
- 6.1.1.2.1. UPS
- 6.1.1.2.2. Generators
- 6.1.1.3. Service
- 6.1.1.1. Power Distribution Solution
- 6.1.2. Market Segmentation - By Mechanical Infrastructure
- 6.1.2.1. Cooling Systems
- 6.1.2.1.1. Immersion Cooling
- 6.1.2.1.2. Direct-To-Chip Cooling
- 6.1.2.1.3. Rear Door Heat Exchanger
- 6.1.2.1.4. In-Row and In-Rack Cooling
- 6.1.2.2. Racks
- 6.1.2.3. Other Mechanical Infrastructure
- 6.1.2.1. Cooling Systems
- 6.1.3. General Construction
- 6.1.1. Market Segmentation - By Electrical Infrastructure
- 6.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 6.2.1. Power Distribution Solution
- 6.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.2.1.2. Transfer Switches
- 6.2.1.2.1. Static
- 6.2.1.2.2. Automatic (ATS)
- 6.2.1.3. Switchgear
- 6.2.1.3.1. Low-Voltage
- 6.2.1.3.2. Medium-Voltage
- 6.2.1.4. Power Panels and Components
- 6.2.1.5. Others
- 6.2.2. Power Back up Solutions
- 6.2.2.1. UPS
- 6.2.2.2. Generators
- 6.2.3. Service
- 6.2.1. Power Distribution Solution
- 6.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 6.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 6.3.2. Transfer Switches
- 6.3.2.1. Static
- 6.3.2.2. Automatic (ATS)
- 6.3.3. Switchgear
- 6.3.3.1. Low-Voltage
- 6.3.3.2. Medium-Voltage
- 6.3.4. Power Panels and Components
- 6.3.5. Others
- 6.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 6.4.1. UPS
- 6.4.2. Generators
- 6.5. Market Analysis, Insights and Forecast - by Service
- 6.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 6.6.1. Cooling Systems
- 6.6.1.1. Immersion Cooling
- 6.6.1.2. Direct-To-Chip Cooling
- 6.6.1.3. Rear Door Heat Exchanger
- 6.6.1.4. In-Row and In-Rack Cooling
- 6.6.2. Racks
- 6.6.3. Other Mechanical Infrastructure
- 6.6.1. Cooling Systems
- 6.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 6.7.1. Immersion Cooling
- 6.7.2. Direct-To-Chip Cooling
- 6.7.3. Rear Door Heat Exchanger
- 6.7.4. In-Row and In-Rack Cooling
- 6.8. Market Analysis, Insights and Forecast - by Racks
- 6.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 6.10. Market Analysis, Insights and Forecast - by General Construction
- 6.11. Market Analysis, Insights and Forecast - by Tier Type
- 6.11.1. Tier-I and II
- 6.11.2. Tier-III
- 6.11.3. Tier-IV
- 6.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 6.13. Market Analysis, Insights and Forecast - by Tier-III
- 6.14. Market Analysis, Insights and Forecast - by Tier-IV
- 6.15. Market Analysis, Insights and Forecast - by End User
- 6.15.1. Banking, Financial Services, and Insurance
- 6.15.2. IT and Telecommunications
- 6.15.3. Government and Defense
- 6.15.4. Healthcare
- 6.15.5. Other End Users
- 6.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 6.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 6.18. Market Analysis, Insights and Forecast - by Government and Defense
- 6.19. Market Analysis, Insights and Forecast - by Healthcare
- 6.20. Market Analysis, Insights and Forecast - by Other End Users
- 6.21. Market Analysis, Insights and Forecast - by Geography
- 6.21.1. United States
- 6.21.2. Canada
- 6.21.3. Mexico
- 6.22. Market Analysis, Insights and Forecast - by United States
- 6.23. Market Analysis, Insights and Forecast - by Canada
- 6.24. Market Analysis, Insights and Forecast - by Mexico
- 6.1. Market Analysis, Insights and Forecast - by Infrastructure
- 7. Canada North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7.1. Market Analysis, Insights and Forecast - by Infrastructure
- 7.1.1. Market Segmentation - By Electrical Infrastructure
- 7.1.1.1. Power Distribution Solution
- 7.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.1.1.1.2. Transfer Switches
- 7.1.1.1.2.1. Static
- 7.1.1.1.2.2. Automatic (ATS)
- 7.1.1.1.3. Switchgear
- 7.1.1.1.3.1. Low-Voltage
- 7.1.1.1.3.2. Medium-Voltage
- 7.1.1.1.4. Power Panels and Components
- 7.1.1.1.5. Others
- 7.1.1.2. Power Back up Solutions
- 7.1.1.2.1. UPS
- 7.1.1.2.2. Generators
- 7.1.1.3. Service
- 7.1.1.1. Power Distribution Solution
- 7.1.2. Market Segmentation - By Mechanical Infrastructure
- 7.1.2.1. Cooling Systems
- 7.1.2.1.1. Immersion Cooling
- 7.1.2.1.2. Direct-To-Chip Cooling
- 7.1.2.1.3. Rear Door Heat Exchanger
- 7.1.2.1.4. In-Row and In-Rack Cooling
- 7.1.2.2. Racks
- 7.1.2.3. Other Mechanical Infrastructure
- 7.1.2.1. Cooling Systems
- 7.1.3. General Construction
- 7.1.1. Market Segmentation - By Electrical Infrastructure
- 7.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 7.2.1. Power Distribution Solution
- 7.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.2.1.2. Transfer Switches
- 7.2.1.2.1. Static
- 7.2.1.2.2. Automatic (ATS)
- 7.2.1.3. Switchgear
- 7.2.1.3.1. Low-Voltage
- 7.2.1.3.2. Medium-Voltage
- 7.2.1.4. Power Panels and Components
- 7.2.1.5. Others
- 7.2.2. Power Back up Solutions
- 7.2.2.1. UPS
- 7.2.2.2. Generators
- 7.2.3. Service
- 7.2.1. Power Distribution Solution
- 7.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 7.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 7.3.2. Transfer Switches
- 7.3.2.1. Static
- 7.3.2.2. Automatic (ATS)
- 7.3.3. Switchgear
- 7.3.3.1. Low-Voltage
- 7.3.3.2. Medium-Voltage
- 7.3.4. Power Panels and Components
- 7.3.5. Others
- 7.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 7.4.1. UPS
- 7.4.2. Generators
- 7.5. Market Analysis, Insights and Forecast - by Service
- 7.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 7.6.1. Cooling Systems
- 7.6.1.1. Immersion Cooling
- 7.6.1.2. Direct-To-Chip Cooling
- 7.6.1.3. Rear Door Heat Exchanger
- 7.6.1.4. In-Row and In-Rack Cooling
- 7.6.2. Racks
- 7.6.3. Other Mechanical Infrastructure
- 7.6.1. Cooling Systems
- 7.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 7.7.1. Immersion Cooling
- 7.7.2. Direct-To-Chip Cooling
- 7.7.3. Rear Door Heat Exchanger
- 7.7.4. In-Row and In-Rack Cooling
- 7.8. Market Analysis, Insights and Forecast - by Racks
- 7.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 7.10. Market Analysis, Insights and Forecast - by General Construction
- 7.11. Market Analysis, Insights and Forecast - by Tier Type
- 7.11.1. Tier-I and II
- 7.11.2. Tier-III
- 7.11.3. Tier-IV
- 7.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 7.13. Market Analysis, Insights and Forecast - by Tier-III
- 7.14. Market Analysis, Insights and Forecast - by Tier-IV
- 7.15. Market Analysis, Insights and Forecast - by End User
- 7.15.1. Banking, Financial Services, and Insurance
- 7.15.2. IT and Telecommunications
- 7.15.3. Government and Defense
- 7.15.4. Healthcare
- 7.15.5. Other End Users
- 7.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 7.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 7.18. Market Analysis, Insights and Forecast - by Government and Defense
- 7.19. Market Analysis, Insights and Forecast - by Healthcare
- 7.20. Market Analysis, Insights and Forecast - by Other End Users
- 7.21. Market Analysis, Insights and Forecast - by Geography
- 7.21.1. United States
- 7.21.2. Canada
- 7.21.3. Mexico
- 7.22. Market Analysis, Insights and Forecast - by United States
- 7.23. Market Analysis, Insights and Forecast - by Canada
- 7.24. Market Analysis, Insights and Forecast - by Mexico
- 7.1. Market Analysis, Insights and Forecast - by Infrastructure
- 8. Mexico North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8.1. Market Analysis, Insights and Forecast - by Infrastructure
- 8.1.1. Market Segmentation - By Electrical Infrastructure
- 8.1.1.1. Power Distribution Solution
- 8.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.1.1.1.2. Transfer Switches
- 8.1.1.1.2.1. Static
- 8.1.1.1.2.2. Automatic (ATS)
- 8.1.1.1.3. Switchgear
- 8.1.1.1.3.1. Low-Voltage
- 8.1.1.1.3.2. Medium-Voltage
- 8.1.1.1.4. Power Panels and Components
- 8.1.1.1.5. Others
- 8.1.1.2. Power Back up Solutions
- 8.1.1.2.1. UPS
- 8.1.1.2.2. Generators
- 8.1.1.3. Service
- 8.1.1.1. Power Distribution Solution
- 8.1.2. Market Segmentation - By Mechanical Infrastructure
- 8.1.2.1. Cooling Systems
- 8.1.2.1.1. Immersion Cooling
- 8.1.2.1.2. Direct-To-Chip Cooling
- 8.1.2.1.3. Rear Door Heat Exchanger
- 8.1.2.1.4. In-Row and In-Rack Cooling
- 8.1.2.2. Racks
- 8.1.2.3. Other Mechanical Infrastructure
- 8.1.2.1. Cooling Systems
- 8.1.3. General Construction
- 8.1.1. Market Segmentation - By Electrical Infrastructure
- 8.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 8.2.1. Power Distribution Solution
- 8.2.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.2.1.2. Transfer Switches
- 8.2.1.2.1. Static
- 8.2.1.2.2. Automatic (ATS)
- 8.2.1.3. Switchgear
- 8.2.1.3.1. Low-Voltage
- 8.2.1.3.2. Medium-Voltage
- 8.2.1.4. Power Panels and Components
- 8.2.1.5. Others
- 8.2.2. Power Back up Solutions
- 8.2.2.1. UPS
- 8.2.2.2. Generators
- 8.2.3. Service
- 8.2.1. Power Distribution Solution
- 8.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 8.3.1. PDU - Basic & Smart - Metered & Switched solutions
- 8.3.2. Transfer Switches
- 8.3.2.1. Static
- 8.3.2.2. Automatic (ATS)
- 8.3.3. Switchgear
- 8.3.3.1. Low-Voltage
- 8.3.3.2. Medium-Voltage
- 8.3.4. Power Panels and Components
- 8.3.5. Others
- 8.4. Market Analysis, Insights and Forecast - by Power Back up Solutions
- 8.4.1. UPS
- 8.4.2. Generators
- 8.5. Market Analysis, Insights and Forecast - by Service
- 8.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 8.6.1. Cooling Systems
- 8.6.1.1. Immersion Cooling
- 8.6.1.2. Direct-To-Chip Cooling
- 8.6.1.3. Rear Door Heat Exchanger
- 8.6.1.4. In-Row and In-Rack Cooling
- 8.6.2. Racks
- 8.6.3. Other Mechanical Infrastructure
- 8.6.1. Cooling Systems
- 8.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 8.7.1. Immersion Cooling
- 8.7.2. Direct-To-Chip Cooling
- 8.7.3. Rear Door Heat Exchanger
- 8.7.4. In-Row and In-Rack Cooling
- 8.8. Market Analysis, Insights and Forecast - by Racks
- 8.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 8.10. Market Analysis, Insights and Forecast - by General Construction
- 8.11. Market Analysis, Insights and Forecast - by Tier Type
- 8.11.1. Tier-I and II
- 8.11.2. Tier-III
- 8.11.3. Tier-IV
- 8.12. Market Analysis, Insights and Forecast - by Tier-I and II
- 8.13. Market Analysis, Insights and Forecast - by Tier-III
- 8.14. Market Analysis, Insights and Forecast - by Tier-IV
- 8.15. Market Analysis, Insights and Forecast - by End User
- 8.15.1. Banking, Financial Services, and Insurance
- 8.15.2. IT and Telecommunications
- 8.15.3. Government and Defense
- 8.15.4. Healthcare
- 8.15.5. Other End Users
- 8.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 8.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 8.18. Market Analysis, Insights and Forecast - by Government and Defense
- 8.19. Market Analysis, Insights and Forecast - by Healthcare
- 8.20. Market Analysis, Insights and Forecast - by Other End Users
- 8.21. Market Analysis, Insights and Forecast - by Geography
- 8.21.1. United States
- 8.21.2. Canada
- 8.21.3. Mexico
- 8.22. Market Analysis, Insights and Forecast - by United States
- 8.23. Market Analysis, Insights and Forecast - by Canada
- 8.24. Market Analysis, Insights and Forecast - by Mexico
- 8.1. Market Analysis, Insights and Forecast - by Infrastructure
- 9. United States North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10. Canada North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11. Mexico North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 12. Rest of North America North America Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 13. Competitive Analysis
- 13.1. Market Share Analysis 2024
- 13.2. Company Profiles
- 13.2.1 Turner Construction Co
- 13.2.1.1. Overview
- 13.2.1.2. Products
- 13.2.1.3. SWOT Analysis
- 13.2.1.4. Recent Developments
- 13.2.1.5. Financials (Based on Availability)
- 13.2.2 Hensel Phelps Construction Co Inc
- 13.2.2.1. Overview
- 13.2.2.2. Products
- 13.2.2.3. SWOT Analysis
- 13.2.2.4. Recent Developments
- 13.2.2.5. Financials (Based on Availability)
- 13.2.3 DPR CONSTRUCTION INC
- 13.2.3.1. Overview
- 13.2.3.2. Products
- 13.2.3.3. SWOT Analysis
- 13.2.3.4. Recent Developments
- 13.2.3.5. Financials (Based on Availability)
- 13.2.4 Clune Construction Company LP
- 13.2.4.1. Overview
- 13.2.4.2. Products
- 13.2.4.3. SWOT Analysis
- 13.2.4.4. Recent Developments
- 13.2.4.5. Financials (Based on Availability)
- 13.2.5 IBM Corporation
- 13.2.5.1. Overview
- 13.2.5.2. Products
- 13.2.5.3. SWOT Analysis
- 13.2.5.4. Recent Developments
- 13.2.5.5. Financials (Based on Availability)
- 13.2.6 Holder Construction Company
- 13.2.6.1. Overview
- 13.2.6.2. Products
- 13.2.6.3. SWOT Analysis
- 13.2.6.4. Recent Developments
- 13.2.6.5. Financials (Based on Availability)
- 13.2.7 Fortis Construction Inc
- 13.2.7.1. Overview
- 13.2.7.2. Products
- 13.2.7.3. SWOT Analysis
- 13.2.7.4. Recent Developments
- 13.2.7.5. Financials (Based on Availability)
- 13.2.8 Nabholz Construction Corporation
- 13.2.8.1. Overview
- 13.2.8.2. Products
- 13.2.8.3. SWOT Analysis
- 13.2.8.4. Recent Developments
- 13.2.8.5. Financials (Based on Availability)
- 13.2.9 Rittal GMBH & Co KG
- 13.2.9.1. Overview
- 13.2.9.2. Products
- 13.2.9.3. SWOT Analysis
- 13.2.9.4. Recent Developments
- 13.2.9.5. Financials (Based on Availability)
- 13.2.10 Hitachi Corporation
- 13.2.10.1. Overview
- 13.2.10.2. Products
- 13.2.10.3. SWOT Analysis
- 13.2.10.4. Recent Developments
- 13.2.10.5. Financials (Based on Availability)
- 13.2.11 AECOM
- 13.2.11.1. Overview
- 13.2.11.2. Products
- 13.2.11.3. SWOT Analysis
- 13.2.11.4. Recent Developments
- 13.2.11.5. Financials (Based on Availability)
- 13.2.12 HITT Contrating Inc
- 13.2.12.1. Overview
- 13.2.12.2. Products
- 13.2.12.3. SWOT Analysis
- 13.2.12.4. Recent Developments
- 13.2.12.5. Financials (Based on Availability)
- 13.2.13 Schneider Electric SE
- 13.2.13.1. Overview
- 13.2.13.2. Products
- 13.2.13.3. SWOT Analysis
- 13.2.13.4. Recent Developments
- 13.2.13.5. Financials (Based on Availability)
- 13.2.1 Turner Construction Co
List of Figures
- Figure 1: North America Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: North America Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: North America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: North America Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 6: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 7: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 8: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 9: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 10: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 11: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 12: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 13: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 14: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 15: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 16: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 17: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 18: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 19: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 20: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 21: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 22: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 23: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 24: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 25: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 26: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 27: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 28: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 29: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 30: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 31: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 32: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 33: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 34: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 35: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 36: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 37: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 38: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 39: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 40: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 41: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 42: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 43: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 44: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 45: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 46: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 47: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 48: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 49: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 50: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 51: North America Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 52: North America Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 53: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 54: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 55: United States North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 56: United States North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 57: Canada North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 58: Canada North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 59: Mexico North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 60: Mexico North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 61: Rest of North America North America Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 62: Rest of North America North America Data Center Construction Market Volume (K Unit) Forecast, by Application 2019 & 2032
- Table 63: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 64: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 65: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 66: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 67: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 68: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 69: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 70: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 71: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 72: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 73: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 74: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 75: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 76: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 77: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 78: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 79: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 80: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 81: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 82: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 83: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 84: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 85: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 86: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 87: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 88: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 89: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 90: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 91: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 92: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 93: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 94: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 95: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 96: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 97: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 98: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 99: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 100: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 101: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 102: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 103: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 104: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 105: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 106: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 107: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 108: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 109: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 110: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 111: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 112: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 113: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 114: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 115: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 116: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 117: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 118: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 119: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 120: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 121: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 122: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 123: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 124: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 125: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 126: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 127: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 128: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 129: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 130: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 131: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 132: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 133: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 134: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 135: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 136: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 137: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 138: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 139: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 140: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 141: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 142: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 143: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 144: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 145: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 146: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 147: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 148: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 149: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 150: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 151: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 152: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 153: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 154: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 155: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 156: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 157: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 158: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 159: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 160: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 161: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 162: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 163: North America Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 164: North America Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 165: North America Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 166: North America Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 167: North America Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 168: North America Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 169: North America Data Center Construction Market Revenue Million Forecast, by Power Back up Solutions 2019 & 2032
- Table 170: North America Data Center Construction Market Volume K Unit Forecast, by Power Back up Solutions 2019 & 2032
- Table 171: North America Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 172: North America Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 173: North America Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 174: North America Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 175: North America Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 176: North America Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 177: North America Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 178: North America Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 179: North America Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 180: North America Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 181: North America Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 182: North America Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 183: North America Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 184: North America Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 185: North America Data Center Construction Market Revenue Million Forecast, by Tier-I and II 2019 & 2032
- Table 186: North America Data Center Construction Market Volume K Unit Forecast, by Tier-I and II 2019 & 2032
- Table 187: North America Data Center Construction Market Revenue Million Forecast, by Tier-III 2019 & 2032
- Table 188: North America Data Center Construction Market Volume K Unit Forecast, by Tier-III 2019 & 2032
- Table 189: North America Data Center Construction Market Revenue Million Forecast, by Tier-IV 2019 & 2032
- Table 190: North America Data Center Construction Market Volume K Unit Forecast, by Tier-IV 2019 & 2032
- Table 191: North America Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 192: North America Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 193: North America Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 194: North America Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 195: North America Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 196: North America Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 197: North America Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 198: North America Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 199: North America Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 200: North America Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 201: North America Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 202: North America Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 203: North America Data Center Construction Market Revenue Million Forecast, by Geography 2019 & 2032
- Table 204: North America Data Center Construction Market Volume K Unit Forecast, by Geography 2019 & 2032
- Table 205: North America Data Center Construction Market Revenue Million Forecast, by United States 2019 & 2032
- Table 206: North America Data Center Construction Market Volume K Unit Forecast, by United States 2019 & 2032
- Table 207: North America Data Center Construction Market Revenue Million Forecast, by Canada 2019 & 2032
- Table 208: North America Data Center Construction Market Volume K Unit Forecast, by Canada 2019 & 2032
- Table 209: North America Data Center Construction Market Revenue Million Forecast, by Mexico 2019 & 2032
- Table 210: North America Data Center Construction Market Volume K Unit Forecast, by Mexico 2019 & 2032
- Table 211: North America Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 212: North America Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the North America Data Center Construction Market?
The projected CAGR is approximately 6.20%.
2. Which companies are prominent players in the North America Data Center Construction Market?
Key companies in the market include Turner Construction Co, Hensel Phelps Construction Co Inc, DPR CONSTRUCTION INC, Clune Construction Company LP, IBM Corporation, Holder Construction Company, Fortis Construction Inc, Nabholz Construction Corporation, Rittal GMBH & Co KG, Hitachi Corporation, AECOM, HITT Contrating Inc, Schneider Electric SE.
3. What are the main segments of the North America Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Back up Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier-I and II, Tier-III, Tier-IV, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users, Geography, United States, Canada, Mexico.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Growing Cloud Applications. AI. and Big Data; Growing Adoption of Hyperscale Data Centers in Large Enterprises; Advent Green Data Center.
6. What are the notable trends driving market growth?
United States of America to hold major market share.
7. Are there any restraints impacting market growth?
High CaPex. OpEx & TCO for building Data Center.
8. Can you provide examples of recent developments in the market?
N/A
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 4750, USD 5250, and USD 8750 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "North America Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the North America Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the North America Data Center Construction Market?
To stay informed about further developments, trends, and reports in the North America Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence